Pre-Renovation Assessment

Restoration, inspection, construction and renovation under one plugged-in system.

Where does pre-renovation assessment fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Pre-Renovation Assessment

Scoped room by room, with the rest of the home kept usable during the work.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For condo owners: Pre-Renovation Assessment

Planned around the building rules, the board approval and the access schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Pre-Renovation Assessment

Scheduled around the business, with the trades working in order and the site kept safe.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For rental properties: Pre-Renovation Assessment

Planned for durability and a fast turnaround between tenants.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Pre-Renovation Assessment

Built into the full new-build plan, with one lead from the first drawing to handover.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Pre-Renovation Assessment

Find the hidden problems before the walls are open, so your renovation is planned around what is really there.

What it is

Most renovation surprises come from behind the walls: water damage, undersized wiring, old plumbing or framing that has moved. A pre-renovation assessment looks for these before the scope and budget are set.

The result is a clearer plan, fewer change orders and a renovation that is built on what is actually there.

How it works

  1. Walk the spaceWe look at the rooms you plan to change, and the areas around them.
  2. Check what is hiddenMoisture readings, openings and checks where the trades will work.
  3. Review the planWe tell you what affects the design, the structure and the schedule.
  4. Plan the renovationYou get a scope and timeline that starts from the real condition of the home.

What we look at

Structure

Load-bearing walls, floors and any changes that need engineering.

Moisture and envelope

Water entry and the condition of the building envelope.

Systems

Electrical, plumbing and HVAC conditions that affect the work.

Decision 1: Where pre-renovation assessment is used

A pre-renovation assessment is used before kitchens, basements, additions and whole-home work. It finds the conditions behind the walls before the scope and budget are set.

ProjectWhat is foundWhat matters most
Kitchen or bathroomPlumbing, electrical, moistureServices that need moving
BasementMoisture, drainage, ceiling heightWater path and headroom
AdditionFoundation, framing, tie-insLoad path and structure
Whole-homeStructure, systems, envelopeThe whole house as one system

Our pick: Assess before the scope is set. A renovation planned on hidden conditions changes its price later.

Decision 2: Checking the structure

The structure is checked for load path, movement and damage. Load-bearing walls and floor spans are identified before any design is set.

ElementCheck
Load-bearing wallsIdentified and marked
Floor spans and joistsSize, spacing, damage
FoundationCracks, movement, moisture

Our pick: Identify the load path first. Every removal decision depends on it.

Decision 3: Moisture and envelope

Moisture is the most common hidden problem. Readings in the walls and floors show where water has been, even when the surface looks dry.

LocationReading
Wall cavitiesMoisture readings at the plates
Subfloor and joistsReadings at the framing
Exterior envelopeFlashing, sealing, staining

Our pick: Read the moisture before you finish. Water behind the new finish is the most expensive surprise.

Decision 4: Systems: electrical, plumbing and HVAC

The systems are checked for capacity, age and condition. The renovation often needs a system upgrade that is cheaper to do while the walls are open.

SystemWhat is checked
ElectricalPanel capacity, wiring type, circuits
PlumbingMaterial, drains, venting
HVACSizing, ducts, condition

Our pick: Plan the system upgrade with the renovation. Opening walls twice costs far more.

Decision 5: Openings and access

The assessment looks at where the walls can open, what sits behind them, and where access is needed for the trades.

ItemWhat it decides
Walls to openWhere the trades can work
Services behindWhat must be moved or protected
Access routesHow the materials and waste come out

Our pick: Mark the openings before the design. The openings decide what is possible.

Decision 6: Hazards found before work

Older homes can contain materials that need testing before disturbance. The assessment identifies them so the work is planned around them.

MaterialAction
Suspected asbestosTested before disturbance
Lead paintTested before sanding or removal
MouldAssessed and planned for

Our pick: Test before you disturb. Hazards found mid-work stop the job and cost more.

Decision 7: Scope and the budget

The findings become the scope. Each item is written with its reason, so the budget reflects the real condition of the house.

Scope itemWhy
Structural workNeeded to carry the new layout
Moisture remediationNeeded before the finish
System upgradeNeeded for the new loads

Our pick: Every scope line has a reason from the assessment. That is what makes the budget defensible.

Decision 8: Permits and approvals

The assessment identifies what needs permits, engineering or approval, so the timeline includes them from the start.

ItemUsual approval
Structural changeEngineering and permit
New plumbing or electricalTrade permits and inspections
Exterior changeMunicipal check

Our pick: Know the approvals before you commit to the timeline.

Decision 9: Handover of the assessment

The assessment report is handed over with photos and a plain-language summary. It goes with the renovation plan and the house file.

DocumentUse
Photos and locationsWhere each finding is
Scope summaryWhat the renovation needs
House fileKept for later work

Our pick: Keep the assessment with the house file. It is the baseline for every change after it.

Decision 10: After the assessment

The assessment leads straight into the renovation plan. The next step is a scope that starts from the real condition of the house.

Next stepWhen
Renovation scopeAfter the assessment is accepted
Specialist workWhere a finding needs it
ScheduleSet around the approvals

Our pick: Move from the assessment to the scope in one step. The conditions are fresh and the plan holds.

Questions

Is this worth doing for a small renovation?

It is most valuable for kitchens, basements and additions, where hidden problems are common. We will tell you if it is not needed.

Does this include the renovation?

No. It is the planning step. You can go ahead with us or with another team.

How long does it take?

It depends on the size of the home. We confirm the timing on the visit.

Related: Kitchen RemodelsBasement RenovationsAll renovations

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →