Design-Build Projects

Restoration, inspection, construction and renovation under one plugged-in system.

Where does design-build projects fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Design-Build Projects

Planned from the first drawing to handover, with one lead for the design, permits and trades.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For growing families: Design-Build Projects

Planned so the house works for the family during the build and after it.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For investors: Design-Build Projects

Planned around the zoning, the rental plan and the budget, with the scope agreed in writing.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial owners: Design-Build Projects

Built to the commercial code, with the schedule set around the business.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For developers and builders: Design-Build Projects

Scheduled and priced against the drawings, with one team across the site.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Design-Build Projects

One team designs and builds the project. One contract, one lead, and no gap between the drawings and the build.

What it is

In a design-build project, the design and the construction are managed by the same team. That removes the handoff between the designer and the builder, where costs and questions usually get lost.

You get one contract, one lead and a schedule that is planned from the start.

How it works

  1. Brief and site visitWe learn what you need and walk the site.
  2. DesignDrawings and specifications are prepared with the build in mind.
  3. Approvals and pricingPermits are applied for and the scope is priced against the drawings.
  4. Build and handoverOne team builds to the plan, with a final walkthrough at the end.

What we look at

Custom homes

New homes designed and built from the ground up.

Additions and renovations

Larger projects where the design and build need to stay connected.

Decision 1: Where design-build is used

Design-build is used when one team designs and builds the project under one contract. It suits custom homes, additions and renovations where the design and the cost need to stay connected.

ProjectTypical scopeWhat matters most
Custom homeDesign, permits, buildCost held to the design
AdditionDesign, structure, buildTie-in and approvals
RenovationDesign, scope, buildScope held from the start

Our pick: Use design-build when the design and the build must stay connected. The handoff is where costs are lost.

Decision 2: Briefing and the site visit

The brief is written with the owner before the design starts. The site is visited so the design starts from the real conditions.

InputPurpose
Owner briefThe needs, the budget and the timeline
Site visitThe grade, the access and the conditions
ConstraintsZoning, services and neighbours

Our pick: Write the brief before the first sketch. The design follows the brief, not the other way.

Decision 3: Concept and design

The concept is designed with the build in mind. Materials, structure and the sequence are decided early so the design can be built as drawn.

Design stepBuilt in
ConceptLayout and massing
StructureEngineering from the start
MaterialsChosen for the build and the budget

Our pick: Design for the build from the start. A design that cannot be built as drawn costs time and money.

Decision 4: Permits and approvals

The permit is applied for on the design drawings. The approvals run in parallel with the pricing, so the schedule holds.

ApprovalWho
Zoning and varianceMunicipality
Building permitMunicipality
EngineeringEngineer

Our pick: Run the approvals in parallel with the pricing. Waiting for the permit stops the schedule.

Decision 5: Pricing against the drawings

The scope is priced against the drawings, so the cost is tied to what is designed. Changes are priced in writing before they are built.

ItemHow it is priced
Base scopePriced to the drawings
Owner changesPriced in writing before work
AllowancesStated clearly with the reason

Our pick: Price against the drawings and record every change. Unrecorded changes are the source of disputes.

Decision 6: Coordination and the single lead

One lead manages the design, the approvals and the trades. The owner has one point of contact from the first drawing to handover.

RoleResponsibility
Design leadDrawings, approvals, coordination
Site leadTrades, schedule, quality
OwnerDecisions made in writing

Our pick: Keep one lead for the whole project. Two points of contact slow every decision.

Decision 7: Quality and inspections

Quality is checked at each stage against the drawings and the code. Inspections are booked before work is covered.

StageCheck
FramingAgainst the drawings and code
Rough-inInspected before cover
FinishChecked against the design

Our pick: Check quality at each stage, not only at the end.

Decision 8: Changes during the build

Changes are allowed, but they are priced and scheduled in writing before they are built. The effect on cost and time is shown first.

ChangeShown before work
Design changeDrawing update and price
Material changePrice difference and lead time
Schedule changeEffect on the trades

Our pick: Show the effect of a change before it is built. The owner decides with the full picture.

Decision 9: Handover and warranty

At handover the owner gets the drawings as built, the permits, the warranties and a maintenance plan. The record stays with the house.

DocumentUse
Drawings as builtThe house as constructed
Permits and inspectionsProof of approval
Warranties and maintenanceCare and claims

Our pick: Hand over the drawings as built. They are the house record for every future change.

Questions

Do I still need an architect?

It depends on the project. We tell you what is needed for permits and the design.

Can I change the design during the build?

Changes are possible. We price and schedule them in writing so you know the effect.

Is design-build cheaper?

It is often more predictable, because the design and the build are planned together. We will show you how the scope is priced.

Related: Custom Homes & New BuildsHome Additions & ExtensionsAll builds

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →