Bathroom Renovations

Restoration, inspection, construction and renovation under one plugged-in system.

Where does bathroom renovations fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Bathroom Renovations

Scoped room by room, with the rest of the home kept usable during the work.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For condo owners: Bathroom Renovations

Planned around the building rules, the board approval and the access schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Bathroom Renovations

Scheduled around the business, with the trades working in order and the site kept safe.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For rental properties: Bathroom Renovations

Planned for durability and a fast turnaround between tenants.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Bathroom Renovations

Built into the full new-build plan, with one lead from the first drawing to handover.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

The Plug · Renovate

Bathroom Renovations

Layout, waterproofing and ventilation handled first, so the finish is built to last.

Bathroom Renovations
Quick answer: A bathroom refresh with the same layout, new finishes and fixtures usually takes 2 to 4 weeks on site. A full bathroom with a new layout, moved plumbing, new waterproofing and a custom shower usually takes 4 to 8 weeks on site, plus design and ordering. Moved drains and vents and the ventilation path decide which one you are in.
Refresh: 2 to 4 weeksSame layout. New vanity, fixtures, lighting and surfaces.
Full bathroom: 4 to 8 weeks on siteMoved plumbing, new waterproofing, custom shower and tile.
Ventilation is not optionalA ducted exhaust fan to the outside is checked and sized for the room.
Waterproofing decides longevityTile is only as good as the membrane behind it.
Which bathroom project is this?

0 or 1 ticked: a refresh, 2 to 4 weeks on site. 2 or 3 ticked: a mid-scope project, 4 to 6 weeks on site plus design and ordering. 4 or 5 ticked: a full bathroom, plan for 6 to 10 weeks including design, permits and ordering.

The stages of a bathroom renovation, with typical timing

StageWhat happensTypical timeWhat moves it
Measure and layoutFixture locations, clearances, door swing, ventilation path1 to 2 weeksMoved drains and vents
Design and selectionsTile, glass, vanity, fixtures, lighting, niche and shower layout2 to 4 weeksCustom glass and tile lead times
Permits (where needed)Plumbing or electrical permits when lines or circuits change2 to 6 weeksDrain relocation, new circuits
OrderingFixtures, vanity, glass, tile, specialty items2 to 8 weeksCustom glass and imported tile
Demolition and rough-inRemove old finishes, rough plumbing, exhaust fan and electrical, inspections1 to 2 weeksCondition of old lines and subfloor
Waterproofing and tileMembrane, backer board, tile, grout, sealant1 to 2 weeksCure times and sequencing
Fixtures and finalVanity, toilet, glass, lighting, accessories, final inspection3 to 7 daysGlass templating and install

What a bathroom needs behind the finish

Waterproofing behind tile

Tile and grout are not waterproof. The membrane behind them is. A shower without a proper membrane will leak into the framing over time, which is how mould and rot start inside walls.

Exhaust ventilation

A bathroom needs a fan that vents outside, sized for the room. Fans that dump into the attic cause condensation and mould on the roof structure.

Subfloor and framing

A heavier tub, a floor-mounted toilet or a larger vanity can need the floor checked. Finding this after tile is down means demolition.

Layout and fixtures: what changes the plan

Moving a toilet, sink or tub changes the drain path, the vent and sometimes the floor structure. A shower niche, a larger walk-in shower or a heated floor each adds rough-in work. We lay out the bathroom with clearances in mind, so the door swing, the vanity drawer and the shower door all work at the same time.

Rule of thumb: tile is the last thing to decide, not the first. Pick the layout and the systems, then the finish.

How we run bathroom projects, the Real Method way

1
Clear Scope
We write down the layout, every fixture, the waterproofing standard and the ventilation path, and what each one costs in time.
2
Read the room
We check the subfloor, the existing drains, the vent and the fan before the design is locked.
3
Map the permits
Plumbing and electrical changes are mapped to their permit paths and review times.
4
Sequence the trades
Rough-in, inspection, waterproofing, tile, fixtures, in the order the build needs.
5
Protect the schedule
Each change is shown with its time impact in writing before you approve it.

Questions homeowners ask about bathrooms

Do I need a permit to change my bathroom?

Not for a refresh with no plumbing or electrical changes. Moving drains, adding fixtures or new circuits usually needs a permit.

How long is the bathroom out of use?

For a full bathroom, plan for a few weeks without a usable shower or toilet. We plan a temporary arrangement and a clear schedule so you know which days are which.

Frequently asked questions

How long does a bathroom renovation take?

A refresh with the same layout usually takes 2 to 4 weeks on site. A full bathroom with moved plumbing or a custom shower usually takes 4 to 8 weeks on site, plus design and ordering, so 6 to 10 weeks end to end.

Does my bathroom need a fan that vents outside?

Yes, in most cases. A fan that vents outside, sized for the room, protects the finish and the framing. A fan that vents into the attic causes condensation and damage over time.

Why is waterproofing so important?

Tile and grout let water through over time. The membrane behind them keeps water out of the framing. Skipping it is one of the most common causes of hidden damage in bathrooms.

Related searches: bathroom renovation toronto, bathroom renovation timeline, bathroom remodel gta, bathroom waterproofing toronto, how long does a bathroom renovation take

Related: kitchen remodels, basement renovations and mould remediation if moisture is already present.

Keep plugging in: what to read next

Quick answer

What does this mean for your house?

Tell us your city and what you need to know. We reply with what applies to your situation, not a generic answer.

    Ready to get plugged in?

    Pick the way that suits you. We take it from there, and you stay in control.

    Let’s Talk!

    Let’s Build Something Solid Together

    Want a free consult? Tell us if you are renovating, building, adding on or restoring. We will tell you what to do next. Call, email, or book a time online.

    How this works, decision by decision

    Decision 1: Where bathroom renovations are used

    Bathroom renovations range from a refresh to a full gut. The bathroom type and the layout decide the scope.

    BathroomTypical scopeWhat matters most
    Powder roomVanity, toilet, finishSmall footprint, ventilation
    Main bathroomTub or shower, vanity, tileDaily use, waterproofing
    EnsuiteLayout, shower, storageSpace and privacy
    Basement bathroomEjector pump, shower, finishDrain and moisture

    Our pick: Choose the scope by the bathroom type. A powder room and an ensuite are different jobs.

    Decision 2: Layout and fixtures

    The layout sets the fixtures. Moving a toilet or a shower changes the drain, the vent and the cost.

    ChangeEffect
    Same layoutLowest cost, same drain
    Move toilet or showerDrain and vent changes
    Add a tub or showerSupply and drain added

    Our pick: Keep the drains where they are if you can. Moving a drain is the big cost.

    Decision 3: Waterproofing and backer board

    The shower needs waterproofing behind the tile. Backer board or a membrane keeps the water out of the wall.

    SystemGood for
    Cement backer board with membraneStandard showers
    Liquid membraneComplex shapes and corners
    Pre-formed shower baseQuick install, fewer seams

    Our pick: Waterproof every wet area. A tiled shower without a membrane leaks in time.

    Decision 4: Ventilation and the fan

    The bathroom fan clears moisture. A fan that is too small or vents into the attic causes mould and staining.

    CheckRequirement
    Fan sizeSized to the room
    Vent routeOutside, not into the attic
    ControlsTimer or humidity sensor

    Our pick: Vent the fan outside and size it to the room. It is the quietest way to prevent mould.

    Decision 5: Tile, grout and finish

    Tile and grout are chosen for wet use. The layout, the size and the grout decide how the room cleans and wears.

    ChoiceEffect
    Large format tileFewer grout lines, flat base needed
    Small tile or mosaicMore grout, more detail
    Epoxy groutStain-resistant in wet areas

    Our pick: Choose epoxy grout for wet areas. It stays clean longer.

    Decision 6: Plumbing and drains

    The supply and drain for each fixture are planned before the walls close. Venting is set for each drain.

    ElementCheck
    Supply linesReplaced if galvanised
    DrainsCorrect slope and venting
    Shut-off valvesAccessible for repair

    Our pick: Replace galvanised supply lines during the renovation. Opening walls later costs more.

    Decision 7: Vanity and storage

    The vanity and storage are sized to how the bathroom is used. Counter height and drawer depth decide the daily comfort.

    ItemDecided by
    Vanity sizeRoom and daily use
    StorageDrawers, cabinets, niches
    Mirror and lightingTask light at face height

    Our pick: Plan the storage for the daily routine, not the showroom.

    Decision 8: Permits and inspection

    Bathroom renovations are permitted when they move plumbing or electrical. Replacing fixtures in place usually needs no permit.

    ScopeCheck
    Fixtures in placeUsually no permit
    Moved drain or supplyPermit and inspection
    New electrical or fanElectrical permit and inspection

    Our pick: Confirm the permit before the walls are opened. Plumbing is inspected before it is covered.

    Decision 9: Warranty and maintenance

    Fixtures, tile and waterproofing have their own care needs. Routine checks protect the warranty and the wall behind the tile.

    ItemWhat to do
    CaulkingRenewed when it cracks
    GroutSealed on schedule
    FanCleaned and checked yearly

    Our pick: Renew the caulking when it cracks. It is the first place water gets in.

    Prev
    Next
    x

    Get plugged in

    Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
    • Image
    • SKU
    • Rating
    • Price
    • Stock
    • Availability
    • Add to cart
    • Description
    • Content
    • Weight
    • Dimensions
    • Additional information
    Click outside to hide the comparison bar
    Compare

    Knowledge

    Keep reading.

    Guides that answer the questions before you book.

    Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →