A kitchen is a plumbing, electrical and cabinet job at the same time. Plan all three together.

A kitchen renovation covers the layout, the cabinets, the countertops, the appliances, the plumbing, the electrical and the ventilation. Moving a sink, adding an island with a sink, or adding circuits usually changes the plumbing or wiring, and those changes generally need a permit in Toronto. Confirm the permit scope with Toronto Building before you demolish anything. Order the cabinets and stone early, because their lead times often set the pace. This guide shows the scope, the permit questions, the decisions that change the price, and what to measure before the designer visits.

Book a kitchen site visit

Quick check: how big is your kitchen job?

Answer these four questions. This is general guidance, not a permit or a quote.




Tick a box to see what it means.

What does a kitchen renovation include?

A kitchen renovation can include any of these: the layout and the position of the sink, the range and the fridge; the cabinets; the countertops and backsplash; the appliances; the plumbing lines and drains; the electrical circuits and lighting; the range hood and its ventilation; and the flooring. Each one affects the others, so plan them together rather than one at a time.

Write the scope as a list of what changes. “New kitchen” means different things to different people, and the list is what the contract, the drawings and the permit have to match.

Does a kitchen renovation need a permit?

Work that changes the structure, the plumbing or the electrical generally needs a permit. Common examples include removing or opening a wall, moving plumbing lines, adding new circuits, and changing the ventilation. Painting, replacing like for like, and swapping an appliance in the same place usually do not need one. Check the scope with the City.

For permit questions, Toronto’s building permits page directs readers to Toronto Building Customer Service. Ask in writing which parts of your scope need a permit, and keep the answer with the contract.

The kitchen job, in order

A process diagram. It shows order, not duration.

Plan thelayoutwhat moves Confirm thepermitin writing Measure anddesignto the walls Order cabinetsand stonelead times Demolish andrough inplumbing, wiring Inspectthe rough-inbefore closing Install andfinishcounters, fixtures Finalsign-off Process diagram, in order. It shows the stages, not how long each one takes. Cabinets and stone are often ordered before demolition, so the lead time does not stop the job.

Sources: City of Toronto, Building Permits page, for the customer service route. The stage order is our standard process.

A kitchen with white cabinets and a clean layout, the finished result of a kitchen renovation
Stock image for illustration only. Photo by Zac Gudakov on Unsplash.

Can I move the sink or add an island?

Yes, but it is usually more than a swap. Moving a sink to an island means relocating the drain and the water lines, and that is plumbing work that generally needs a permit. Adding an island with a sink can also change the venting and the electrical. Adding circuits to existing wiring can also need approval.

Ask the designer to show where each line runs before the island is drawn. A layout that looks simple on paper can need a long run of pipe under the floor.

How do I choose a kitchen layout?

Start with how the kitchen is used, not with the cabinet style. Count the people who cook, the people who clean up, and the places where food, dishes and appliances are used. Map the work triangle between the sink, the range and the fridge, and check that the main routes through the room stay clear when doors and drawers are open.

Test the layout on paper before the design is finished. Ask the designer to show the clearances at the sink, the range and the dishwasher, and the walking path from the entrance. A layout that works on paper is much easier to change before the cabinets are ordered.

How do cabinets and countertops fit in?

Cabinets and countertops are made to measure, so the order follows the measurements. Take measurements after the walls, the plumbing and the electrical are roughed in, and confirm them before the cabinets are ordered. A template is taken for the stone, and the stone is ordered once the cabinets are set.

  1. Measure the room. Walls, openings, and fixed items such as windows and the range hood.
  2. Design the cabinets. Confirm the layout and the door and drawer style in writing.
  3. Order the cabinets. Confirm the lead time in writing.
  4. Template the stone. Once the cabinets are set and the sink is placed.
  5. Install and finish. Fixtures, backsplash and appliances last.
A large kitchen with a stone island and white cabinets, an example of a layout with a central island
Stock image for illustration only. Photo by Zac Gudakov on Unsplash.

What changes the cost?

This guide does not publish prices, because the sources we checked were contractor and marketing pages that could not be verified against real jobs. The factors below change the cost, and you can price each one with your builder in writing.

  • Layout changes. Moving a sink, an island or a wall adds plumbing, electrical and structural work.
  • Cabinets and stone. Custom work and natural stone cost more than standard options.
  • Appliances and ventilation. Built-in units and a ducted hood add trades.
  • Hidden conditions. Older wiring, pipes and subfloors can add work once opened.
  • Permits and inspections. Confirm whether permit fees are included in each quote.

What is the order of the job?

Plan the layout first, then confirm the permit, then measure and design. Order the long-lead items before demolition, so the lead time does not stop the job. The rough-in is inspected before the walls are closed. The finishes and fixtures come last.

What does an older kitchen hide?

Older homes can hide wiring, pipes and subfloors behind the cabinets and walls. Once the demolition starts, those conditions can change the scope and the cost. Ask for an inspection before the design is finished, and write the findings down. A short inspection early is cheaper than a change order mid-job.

Quick decision list

Settle each one before you order anything. Progress is saved in this browser only.





0 of 5 done

Which kitchen myths should I ignore?

Myth

“Moving a sink is just a plumbing swap.”

Fact

Moving a sink relocates drain and water lines, which generally needs a permit and a plan.

Myth

“A kitchen renovation is just new cabinets.”

Fact

Cabinets are one part. Plumbing, electrical, ventilation and the structure around them are often part of the job.

Before you start: a kitchen measure and photo checklist

Tick each one before the designer visits. Progress is saved in this browser only.

0 of 5 done

Planning a kitchen renovation?

Book a kitchen site visit. We look at the layout, the walls and the permit scope with you, and put the next steps in writing.

Questions people ask

Do I need a permit to renovate my kitchen in Toronto?

If the work changes the structure, the plumbing or the electrical, it generally needs one. Confirm the scope with Toronto Building before demolition starts.

Can I move the sink?

Yes, with a plan. Moving the sink relocates drain and water lines, which is plumbing work that generally needs a permit.

Can I remove a wall for an open layout?

If the wall is structural, it needs a permit and a design. Ask the designer to confirm the structure before you plan the opening.

When should I order cabinets and stone?

Order cabinets once the layout is set, and confirm the lead time in writing. Stone is templated after the cabinets are set.

Why does an older kitchen cost more?

Hidden wiring, pipes and subfloors can add work once the walls are open. Ask for an inspection before the design is finished.

Should I check fees before I get quotes?

Yes. Ask whether permit fees are included in each quote, so you compare the same scope.

Sources

  • City of Toronto, Building Permits. Used for the statement that permit questions outside the archive records go to Toronto Building Customer Service. The permit scope for a kitchen is confirmed with the City, not with this page.

The permit examples and cost factors in this guide are general. We did not use contractor price pages, because they cannot be checked against a project. Confirm each permit with Toronto Building before work starts.