Second Storey Additions

Restoration, inspection, construction and renovation under one plugged-in system.

Where does second storey additions fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Second Storey Additions

Planned from the first drawing to handover, with one lead for the design, permits and trades.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For growing families: Second Storey Additions

Planned so the house works for the family during the build and after it.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For investors: Second Storey Additions

Planned around the zoning, the rental plan and the budget, with the scope agreed in writing.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial owners: Second Storey Additions

Built to the commercial code, with the schedule set around the business.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For developers and builders: Second Storey Additions

Scheduled and priced against the drawings, with one team across the site.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Second Storey Additions

Add a full floor to your home, planned around the structure, the permits and the family living in the house.

What it is

A second storey addition adds a full floor to a home. It is a larger project than a single-storey extension, because the existing structure has to carry the new load and the roof has to be reworked.

We plan the structure, the permits and the staging so you know how the house will work during the build.

How it works

  1. Assess the structureWe check the foundation, walls and framing to see what the existing house can carry.
  2. Design and permitsDrawings and permit applications are prepared, with engineering where needed.
  3. Build in stagesThe structure, roof and interior are built in a planned order, with the trades coordinated under one lead.
  4. HandoverA final walkthrough, the documents and a plan for the systems in the new floor.

What we look at

Full floor

The whole footprint of the house, sized to the lot and the zoning.

Partial floor

A smaller addition over part of the house, often a primary suite.

Decision 1: Where second storey addition is used

A second storey addition adds a full or partial floor to a house. It suits homes with a sound foundation, enough lot coverage and a structure that can take the load.

HomeTypical additionWhat matters most
BungalowFull second floorFoundation and roof
Two-storey homePrimary suite over a garage or wingLoad and connection
Semi or townhomeLimited by the shared wallZoning and the neighbour

Our pick: Assess the foundation before the design. The foundation sets how much load the house can take.

Decision 2: Structural assessment

The foundation, walls and framing are checked for the load of a new floor. Reinforcement is designed where the existing structure cannot take the load.

ElementCheck
FoundationCapacity for the new load
WallsLoad path and reinforcement
Roof and framingDesign for the new floor

Our pick: Assess the structure first. Reinforcing the foundation is far cheaper than fixing it after.

Decision 3: Design, zoning and permits

The addition is designed to the zoning, the height limit and the setbacks. The drawings and the engineering are the basis for the permit.

ItemCheck
Zoning and heightWithin the by-law
SetbacksClear of the lot lines
EngineeringStructure designed and stamped

Our pick: Check the zoning before the design. A height change after the drawings costs time.

Decision 4: Staging the build

The addition is built in stages: the structure, the roof, then the interior. The house is protected while the roof is open.

StageWhat happens
StructureFloor and walls built
RoofCovered and weathertight
InteriorInsulation, drywall, finish

Our pick: Get the roof on early. An open roof is the biggest risk in the build.

Decision 5: Connection to the existing house

The new floor is connected to the existing structure, the roof and the services. The connection is where most problems happen.

ConnectionCheck
Floor to wallLoad path and fixings
Roof tie-inFlashing and drainage
ServicesPlumbing, electrical and HVAC extended

Our pick: Detail the connections in the drawings. The tie-in is the detail that leaks.

Decision 6: Living in the house during the build

The build is planned so the household can stay where possible. The utilities, the access and the dust are managed through the phases.

ItemPlan
UtilitiesKept on or moved with notice
AccessProtected route through the house
DustContained at the work area

Our pick: Plan the living arrangements before the build starts. The household is part of the project.

Decision 7: Inspections and approvals

The addition is inspected at the framing, the insulation and the final stage. Each inspection is booked before the work is covered.

StageInspection
FramingBefore the cover
Insulation and air barrierBefore the drywall
FinalOn completion

Our pick: Book each inspection before the cover goes on. It is the cheapest way to pass.

Decision 8: Handover and house file

At handover the owner gets the walkthrough, the drawings, the permit and the warranty records. The house file keeps the full record.

DocumentUse
Drawings and engineeringThe addition as built
Permit and inspectionsProof of approval
Warranty recordsCare and claims

Our pick: Hand over the full house file. It is what the next owner will ask for.

Decision 9: Scope, cost and changes

The addition is priced against the drawings, and every change is priced in writing before it is built. The cost follows the structure and the finish chosen.

ItemHow it is handled
Base scopePriced to the engineered drawings
Structural reinforcementPriced once the foundation is assessed
Owner changesPriced and approved in writing before work

Our pick: Price against the drawings and approve each change in writing before it is built.

Questions

Can I live in the house during the build?

Often yes, with planning. We will talk through the staging and what the build means for daily life.

Do I need an engineer?

Usually yes, for the structure. We coordinate the engineering as part of the plan.

How long does it take?

It depends on the size and the approvals. We give you a timeline once the scope is set.

Related: Home Additions & ExtensionsCustom Homes & New BuildsKnowledge guides

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →