Structural Renovations

Restoration, inspection, construction and renovation under one plugged-in system.

Where does structural renovations fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Structural Renovations

Scoped room by room, with the rest of the home kept usable during the work.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For condo owners: Structural Renovations

Planned around the building rules, the board approval and the access schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Structural Renovations

Scheduled around the business, with the trades working in order and the site kept safe.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For rental properties: Structural Renovations

Planned for durability and a fast turnaround between tenants.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Structural Renovations

Built into the full new-build plan, with one lead from the first drawing to handover.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Structural Renovations

Beams, posts, openings and foundations changed safely, with the engineering and permits handled as part of the work.

What it is

A structural renovation changes the load path of a house: a wall comes out, a beam goes in, or a foundation is strengthened. It needs engineering, a plan for temporary support and inspections at the right stages.

We treat structural work as the first step of a renovation, so the design is built on what the structure can actually do.

How it works

  1. Survey the structureWe check the framing, foundation and the load path before any design.
  2. EngineeringAn engineer designs the beam, posts and connections for the change.
  3. Temporary support and buildThe structure is supported during the work, and the new members are installed.
  4. Inspect and close upInspections are booked and the work is closed in only after the approvals.

What we look at

Beams and posts

New load-carrying members for wider openings.

Foundations

Underpinning or repair where the foundation needs support.

Floor systems

Joists and subfloors reinforced where the floor needs to carry more.

Decision 1: Where structural renovation is used

Structural renovation changes the load path of the house: a wall comes out, a beam goes in, a foundation is strengthened, or a floor is reinforced. It is used with openings, additions and level changes.

ChangeTypical workWhat matters most
Wider openingBeam and postsLoad and bearing
Floor reinforcementJoists, sistered membersSpan and deflection
Foundation workUnderpinning, footingsSoil and support
Level changeStructure for a new floorLoad and access

Our pick: Engineer every structural change. The load path decides what can move.

Decision 2: Load path and assessment

The load path is traced from the roof to the foundation before any change is designed. The existing structure is checked for capacity and condition.

ElementCheck
Roof and ceiling loadsCarried to the walls below
Walls and beamsLoad-bearing and bearing points
FoundationCapacity and condition

Our pick: Trace the load first. A structural change designed on the wrong load path fails.

Decision 3: Engineering and design

An engineer designs the beams, posts, connections and any foundation work. The drawings are the basis for the permit and the build.

ElementEngineer designs
Beam and postsSize, material and bearing
ConnectionsBolts, hangers and anchors
Foundation workFootings and underpinning

Our pick: Work from the engineer’s drawings, not from a rule of thumb.

Decision 4: Temporary support

The structure is supported while the change is made. Temporary posts and shoring hold the floors and the roof until the new member is in.

SupportHolds
Temporary postsFloor and ceiling loads
ShoringWalls during removal
MonitoringMovement checked during the work

Our pick: Support first, every time. Removing a wall without support is the most dangerous step in the job.

Decision 5: Installation and connection

The new beam or member is installed to the drawings. The bearing, the connections and the fixings are checked before the support comes out.

StepCheck
Beam placementLevel and on bearing
ConnectionsFixed as drawn
Support removalOnly after the check

Our pick: Check the bearing and the connections before the support comes out.

Decision 6: Permits and inspections

Structural work needs a permit and inspections at the stages the municipality requires. The engineer’s drawings are part of the permit.

StageInspection
Before the workPermit issued on the drawings
Framing and bearingInspection before the cover
FinalInspection on completion

Our pick: Book the inspections before the walls close. It is the cheapest time to fix a problem.

Decision 7: Services and the other trades

The structural work is coordinated with the plumbing, electrical and HVAC, which may need to move around the new member.

TradeCoordination
ElectricalCircuits rerouted around the beam
PlumbingLines rerouted and vented
HVACDucts planned around the new member

Our pick: Plan the services around the beam before it is installed.

Decision 8: Finish and the repair

After the structural work, the finish is restored. The wall, the ceiling and the floor are made good to the existing house.

FinishRestored
CeilingDrywall and finish
FloorLevelled and finished
WallsPatched and painted

Our pick: Restore the finish to the existing house. A patched finish shows the old structure.

Decision 9: Record and after-care

The structural change is recorded with the drawings, the permit, the inspections and the photos. The record stays with the house.

RecordWhat it shows
Engineer’s drawingsThe member as built
Inspection recordsThe approved structure
PhotosThe structure before the finish

Our pick: Keep the drawings and inspections with the house file.

Questions

Do I always need an engineer?

For any change to a load-bearing element, yes. We do not guess on structure.

What is temporary support?

Shoring and posts that hold the house while the structure is changed.

Will this need inspections?

Yes. The structural work is inspected at the stages the municipality requires.

Related: Main Floor Layout ChangesFoundation & Crack RepairAll renovations

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →