Decks & Patios

Restoration, inspection, construction and renovation under one plugged-in system.

Where does decks & patios fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Decks & Patios

Planned for the home you live in, with the work done in order and the site kept clean.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Decks & Patios

Included in the full new-build plan, with the trades coordinated under one lead.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Decks & Patios

Scheduled around occupancy, built to the commercial code and the building use.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For high-rise buildings: Decks & Patios

Planned for vertical access, fire separation, sound and the building schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For renovations: Decks & Patios

Scoped with the rest of the renovation so the trades work in the right order.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Decks & Patios

Outdoor living built to last, with the footings, the ledger and the drainage done properly before the boards go down.

How this guide works

A deck or patio is a structure first and a surface second. The footings, the ledger and the drainage decide how long it lasts. Work through the decisions in order.

Decision 1: Where decks and patios are used

Decks suit houses and cottages. Patios suit ground-level yards. Commercial patios and rooftop decks need engineering and extra permits.

UseTypical buildWhat matters most
Residential decksRaised, wood or compositeFootings, ledger, railing code
Ground patiosStone, pavers or concrete on a baseBase depth, drainage, slope
Commercial patios and rooftopsEngineered, membrane or paversLoad, drainage, access and fire rules

Our pick: Raised decks need engineering and permits. Ground patios need a proper base before the surface.

Decision 2: Footings and structure

Footings carry the deck. Frost depth, soil and the height decide the footing size and type.

FootingUse
Concrete pier with footingMost decks, below frost line
Helical or pre-cast piersTight sites or soft soil
Ground basePatios on compacted gravel

Our pick: Footings below frost depth. A shallow footing heaves in the first winter.

Decision 3: Ledger and house connection

The ledger is where a deck fails. A ledger that is not flashed or fixed properly lets water into the house wall and can pull the deck away.

CheckGood practice
Ledger fixingsLag bolts or through-bolts to the rim
FlashingFlashing lapped over the ledger
ClearanceGap for air and drainage

Our pick: Flash the ledger properly. It is the most common deck failure.

Decision 4: Surface material

The surface sets the look, the maintenance and the price. Choose it for how you will use the space.

MaterialLifeMaintenance
Pressure-treated woodGood with careRegular sealing or staining
Composite deckingLong lifeLow, washing
Stone or paversLong lifeLow, resetting if the base moves

Our pick: Composite for low maintenance. Wood for the look and the budget.

Decision 5: Railings and stairs

Railings and stairs have code heights and spacing. They are checked on every build.

ItemCode point
Guard heightSet by code for the drop
Baluster spacingSet by code to keep children out
Stair rise and runSet by code for safety

Our pick: Build railings and stairs to code. It is also the first thing an inspector checks.

Decision 6: Warning signs and timing

A deck that is failing gives signs before it becomes unsafe. These need checking before the next season of use.

SignAct by
Sagging or bouncy boardsChecking the joists and the footings
Loose or moving ledgerFixing the ledger before anything else
Soft or rotting boardsChecking the framing under them
Wobbling railingChecking the post fixings

Our pick: Fix the ledger and the footings first. The boards can wait; the structure cannot.

Decision 7: Permits and inspection

Decks above a certain height or attached to the house usually need a permit and inspections at the footing and framing stages.

Deck typeCheck
Low, freestanding deckConfirm the size and height limits
Attached deckPermit and footing and ledger inspections
Raised or large deckEngineered drawings and inspections

Our pick: Confirm the permit before the footings are dug. Inspections are easier before the framing is covered.

Decision 8: Coordination with the other trades

A deck depends on the excavation, the concrete and the drainage around it. The order decides how well it holds.

TradeWhat the deck needs
ExcavationUtility locates before the footings are dug
ConcreteFootings cured before the posts are loaded
Railings and stairsBuilt to code with the framing
Landscape and drainageWater moved away from the footings

Our pick: Locate the utilities and set the footings before the framing starts.

Decision 9: Warranty and maintenance

The finish and the fixings decide how long the deck lasts. A maintenance plan is part of the build.

MaterialMaintenance
Pressure-treated woodSeal or stain on a schedule
Composite deckingClean and check the fixings yearly
Stone or paversReset if the base moves

Our pick: Maintain the finish on schedule. It keeps the boards sound and the warranty valid.

Questions

Do I need a permit for a deck?

Often yes, depending on height and size. We confirm it as part of the scope.

Which decking material is best?

It depends on your budget and maintenance preference. We show you the options on the site visit.

How long does a deck last?

A well-built deck lasts many years. Maintenance and drainage make the biggest difference.

Talk to the Plug

Tell us the size, the height and how you want to use the space. We check the footings, the ledger and the drainage, then recommend the surface.

Related: Exterior RenovationsStairs & RailingsAll contracting

Haven’t called the Plug yet?

Call, text, DM us, or submit your project and an expert will call you.

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →