Home Additions & Extensions

Restoration, inspection, construction and renovation under one plugged-in system.

Where does home additions & extensions fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Home Additions & Extensions

Planned from the first drawing to handover, with one lead for the design, permits and trades.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For growing families: Home Additions & Extensions

Planned so the house works for the family during the build and after it.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For investors: Home Additions & Extensions

Planned around the zoning, the rental plan and the budget, with the scope agreed in writing.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial owners: Home Additions & Extensions

Built to the commercial code, with the schedule set around the business.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For developers and builders: Home Additions & Extensions

Scheduled and priced against the drawings, with one team across the site.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Need more room? Plan it before you build it.

Your family is growing, or your home no longer fits how you live. A second storey, a rear extension or a side addition can fix it, but only if the structure, design and budget are right from the start.

Why build your addition with The Plug.

Plan it, price it, then build it.

We start with a site visit, then write the scope: layout, structure, finishes and trades. Every line is priced, and nothing is hidden in an allowance.

You get a written scope, one project lead and photos at every stage. No surprises at the invoice.

home1 ablout 1
home1 ablout 2
home1 ablout 3
ADDITIONS & EXTENSIONS

Home additions & extensions

How an addition runs.

Site visit, scope and budget, design and approvals, build with one team, then walkthrough and handover.

OUR PRACTICE

Plan. Price. Build. Handover.

What an addition includes.

Foundation and structural tie-in, framing, roofing and envelope, electrical and plumbing coordination, insulation, drywall and finishes.

Second storeys and rear extensions
Side additions and sunrooms
Structural tie-ins and new openings
Finishes that match the existing home

Thinking about adding space?

Too small? Too crowded? Ready for more room?

Permits and fees, explained.

Permit fees and development charges can be significant in the GTA. We identify them in the scope before you sign, so you know the real total.

What the scope covers.

Structure check
Design and layout
Trades and materials
Permits and fees
Written scope
Allowances marked
Fees shown up front
home2 s4 01

Built to the scope, checked at every step.

We check the work against the scope at each stage, and you see the photos and sign-offs in one job file.

Foundation checked. Structure built. Space finished.

You get photos, a written record of every change, and a walkthrough before handover.

Written scope before work starts
One schedule across trades
Walkthrough before handover

Scope

Structure and layout checked, and the scope written.

Design

Drawings, approvals and a schedule agreed.
Build
One team, one plan, photos at every stage.
Handover
Walkthrough, records and documents delivered.

How we run every addition.

One team handles structure, trades and finishes from the first plan to the final walkthrough.

How the job runs

Practical guides on additions, extensions and permits.

Start with a site visit.

What happens next.

We work in clear stages and keep you updated in writing.

Photos at every stage
Measurements logged
Documentation for your records

Documented from start to finish.

home1 team 1
GUIDES

Additions guides

What to check before you add on, and how to read a permit set.

Get plugged in.

Start with a site visit.

Service area

The Greater Toronto Area and beyond

Call us

(416) 639-1990
Working hours
Monday to Friday 9am to 6pm, Saturday 10am to 4pm
about7

How we keep you informed.

Let’s Talk!

Let’s Build Something Solid Together

Want a free consult? Tell us if you are renovating, building, adding on or restoring. We will tell you what to do next. Call, email, or book a time online.

How this works, decision by decision

Decision 1: Where home additions are used

A home addition adds space to an existing house: a rear extension, a side addition, a second storey or a garage conversion. The house and the lot decide the type.

AdditionTypical scopeWhat matters most
Rear extensionKitchen or family roomTie-in and drainage
Side additionRoom over the side yardSetbacks and light
Second storeyFull floorFoundation and load
Garage conversionLiving spaceInsulation and ventilation

Our pick: Match the addition to the house and the lot. The existing foundation and roof decide what is possible.

Decision 2: Structural tie-in

The addition is tied into the existing structure. The connection is where the load and the water meet, so it is designed carefully.

ConnectionCheck
FoundationNew footings matched to the existing
WallsTie-in and load path
RoofFlashing and drainage at the join

Our pick: Detail the connection in the drawings. The tie-in is the detail that leaks.

Decision 3: Zoning and setbacks

The addition must fit the zoning, the height and the setbacks. The rules set the footprint and the shape.

RuleCheck
Lot coverageWithin the by-law
SetbacksClear of the lot lines
HeightWithin the limit

Our pick: Check the zoning before the design. A change after the drawings costs time.

Decision 4: Roof and drainage

The roof of the addition is joined to the existing roof. The drainage is set so the water does not pool at the join.

ElementCheck
Roof joinFlashed and lapped correctly
GuttersConnected to the drainage
GradeFalls away from the addition

Our pick: Join the roofs with proper flashing. Water at the join is the most common addition leak.

Decision 5: Insulation and air sealing

The addition is insulated and air sealed to the house standard. The join with the existing walls is sealed.

ElementRequirement
Walls and roofInsulated to the climate
Join to the existing houseAir sealed
WindowsPlaced for heat and light

Our pick: Air seal the join. A poorly sealed join is the first draft in the new room.

Decision 6: Services and the existing house

The services are extended into the addition. The panel, the heat and the drainage are checked for the added load.

ServiceCheck
ElectricalPanel capacity for the added load
HeatingDucts or a new zone
PlumbingDrainage to the existing system

Our pick: Check the panel and the heat for the added load before the design is final.

Decision 7: Permits and inspections

An addition is permitted and inspected at the foundation, the framing and the final stage. The inspections are booked before the covers go on.

StageInspection
FoundationBefore the pour is covered
FramingBefore insulation and drywall
FinalBefore occupancy

Our pick: Book each inspection before the cover goes on. It is the cheapest way to pass.

Decision 8: Living in the house during the build

The addition is built with the household in mind. Access, dust, utilities and the kitchen are planned through the phases.

ItemPlan
AccessProtected route through the house
DustContained at the work area
UtilitiesKept on or moved with notice

Our pick: Plan the living arrangements before the build starts.

Decision 9: Handover and house file

At handover the owner gets the drawings as built, the permit, the inspections and the warranties. The house file keeps the record.

DocumentUse
Drawings as builtFuture changes
Permit and inspectionsProof of approval
WarrantiesClaims within the term

Our pick: Keep the house file current. The addition is part of the house record for life.

Home additions

A rear addition, framed and built on site.

Extensions are scoped in writing first, so the structure, the permits and the trades are planned together before the framing starts.

Rear home addition under construction, framing in progress
Prev
Next
x

Get plugged in

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →