Kitchen Remodels

Restoration, inspection, construction and renovation under one plugged-in system.

Where does kitchen remodels fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Kitchen Remodels

Scoped room by room, with the rest of the home kept usable during the work.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For condo owners: Kitchen Remodels

Planned around the building rules, the board approval and the access schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Kitchen Remodels

Scheduled around the business, with the trades working in order and the site kept safe.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For rental properties: Kitchen Remodels

Planned for durability and a fast turnaround between tenants.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Kitchen Remodels

Built into the full new-build plan, with one lead from the first drawing to handover.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

The Plug · Renovate

Kitchen Remodels

Layout, permits and timelines for kitchens across Toronto and the GTA, explained before you commit.

Quick answer: A kitchen refresh with new finishes and no moved walls usually runs about 4 to 8 weeks from start to finish, including ordering. A full kitchen with moved plumbing, new electrical and a wall change usually takes 6 to 10 weeks of design and ordering, then 10 to 16 weeks on site. The layout and the existing house decide which one you are in.
Refresh: 4 to 8 weeksSame layout, new cabinets or surfaces. Little or no change to plumbing, gas or walls.
Full kitchen: 10 to 16 weeks on siteLayout change, new plumbing and electrical, new ventilation, finishes.
Lead times set the paceCustom cabinets and some appliances take weeks to arrive. Order early.
The layout comes firstWork flow, storage and clearances are fixed on paper before anyone demolishes.
Which kitchen are you actually planning?

0 or 1 ticked: you are in the refresh range, 4 to 8 weeks. 2 or 3 ticked: plan for a full kitchen project with design and permit steps, 14 to 20 weeks end to end. 4 or more ticked: treat it as a structural and mechanical renovation, and get the layout and permit path mapped first.

What a kitchen project goes through, and how long each stage takes

StageWhat happensTypical timeWhat moves it
Measure and layoutField measurements, work triangle, storage plan, appliance sizes1 to 2 weeksHow many decision rounds you need
Design and drawingsCabinet drawings, lighting plan, electrical and plumbing layout2 to 4 weeksCustom work, moved services
Permits (only where needed)Electrical, plumbing or structural permits, where the work requires them2 to 8 weeksWall changes, new circuits, gas work
OrderingCabinets, countertops, appliances, hood, plumbing fixtures, lighting2 to 12 weeksCustom cabinets and specialty appliances
Demolition and rough-inRemove old kitchen, rough plumbing, electrical and ventilation, inspections1 to 3 weeksWhat is hidden in walls and floors
Install and finishCabinets, counters, backsplash, appliances, paint, lighting2 to 4 weeksTemplating and counter fabrication lead time
Final inspection and handoverInspections, final adjustments, clean-up and walkthrough3 to 7 daysInspection scheduling

What decides the layout before anything is built

A kitchen is a set of working distances. The layout has to make the sink, fridge and range work together, and it has to give you enough counter space on each side of them. Most of the frustration people feel in a kitchen comes from getting these distances wrong on paper, and changing them later costs the most time.

The layout rules that matter

The work triangle

The sink, fridge and range should form a triangle with short, clear walking distances between them. Long distances, or a path that crosses a traffic route, make the room tiring to use every day.

Walkway clearances

A common planning guideline is about 1.0 to 1.2 metres of clear floor between counters or an island and other cabinets or walls. Tight aisles are the most common regret after a kitchen is finished.

Counter depth and heights

Standard base cabinets are about 60 cm deep, and standard counter height is about 91 cm. Those numbers can change for accessibility, or for a specific user in the house.

Storage that gets used

Map what you store and where you use it. Pull-out pantries, deep drawers for pots, and a landing space beside the fridge do more daily work than extra wall cabinets.

Lighting in layers

Plan task light over counters, ambient light across the room, and accent light for display. Lighting placement is a wiring decision, so it belongs in the design stage, not after drywall.

Ventilation, electrical and plumbing: the parts that cost time

These are the trades that people do not see until something is wrong, and they are where most kitchen schedules slip. The range hood needs a proper exhaust path to the outside, sized to the cooking appliance. Kitchens with heavy use typically need dedicated circuits for the range, the dishwasher and the fridge, plus enough outlets at the counter. A sink move means new drain and supply lines, and in older houses the existing lines are often the first surprise.

The question to answer first: does the new kitchen move any walls, plumbing, gas or electrical? The answer decides your permit path and your timeline. If you are not sure, the lot and house check is the place to start.

How we run a kitchen project, the Real Method way

1
Clear Scope
We write down the layout goals, the finishes, what is included, what is excluded, and what each change will cost in time.
2
Read the house
We check walls, floors, wiring, plumbing, ventilation and the age of the house before the design is locked.
3
Map the permits
We identify which trades need permits, which do not, and the review time for each, then build the schedule from that.
4
Order in sequence
Long-lead items are ordered early, and trades are booked in the order the build needs them.
5
Protect the schedule
Every change shows its time impact in writing before it is approved.

Questions homeowners ask before a kitchen project

Do I need a permit to replace my kitchen?

Not always. A cosmetic refresh with no changes to plumbing, gas, electrical or structure often needs no building permit. Moving a sink, adding circuits, changing gas lines or removing a wall usually does, and those permits add weeks to the start.

Can I keep my kitchen while it is being done?

Sometimes, for a refresh. A full kitchen usually means a temporary kitchen set up in another room for several weeks, with a plan for water and cooking.

Why do cabinets take so long?

Semi-custom and custom cabinets are built to order, and the build slot is the constraint. Stock cabinets arrive faster but limit layout choices. Choose the cabinet type during design, not during installation.

Frequently asked questions

How long does a kitchen renovation take in the GTA?

A refresh with the same layout usually takes 4 to 8 weeks. A full kitchen with moved plumbing, new electrical or a wall change usually takes 14 to 20 weeks from first design meeting to handover, including design, permits and ordering. Older houses and custom cabinetry can push that longer.

Do I need a permit for a kitchen renovation?

It depends on the work. Cosmetic changes often need none. Plumbing, electrical, gas and structural work usually needs a permit from your municipality. A design check tells you which applies to your plan.

What is the most common kitchen mistake?

Choosing finishes before the layout is final, and leaving too little clearance between counters and islands. Both are fixed on paper in the design stage.

Should I change the layout or keep the same one?

If the layout is working, a refresh is faster and simpler. If the room has poor flow, bad storage or a sink in the wrong place, a layout change is usually worth the extra weeks. We can show you the trade-off.

Related searches: kitchen renovation toronto, kitchen remodel timeline, how long does a kitchen renovation take, kitchen layout ideas, kitchen permit toronto, kitchen remodel gta

See how this fits with our renovation work, and start with a home additions and extensions check if the kitchen is part of a bigger layout change.

Keep plugging in: what to read next

Quick answer

What does this mean for your house?

Tell us your city and what you need to know. We reply with what applies to your situation, not a generic answer.

    Ready to get plugged in?

    Pick the way that suits you. We take it from there, and you stay in control.

    Let’s Talk!

    Let’s Build Something Solid Together

    Want a free consult? Tell us if you are renovating, building, adding on or restoring. We will tell you what to do next. Call, email, or book a time online.

    How this works, decision by decision

    Decision 1: Where kitchen remodels are used

    A kitchen remodel changes the layout, the cabinets, the counters and the services. The existing layout decides how much of the room moves.

    LayoutTypical scopeWhat matters most
    GalleyRe-plan the run, lighting, storageWorking width
    L-shapeCorner storage and counter runCorner access
    U-shapeFull rebuild of three wallsClearances and ventilation
    Open conceptIsland, finishes, flooringServices and sightlines

    Our pick: Start with the layout. Cabinets and finishes follow the way the kitchen works.

    Decision 2: The work triangle and clearances

    The sink, the fridge and the cooktop form the work triangle. Clear walkways and counter space make the kitchen usable for more than one person.

    ElementCheck
    Sink to cooktop to fridgeShort, unobstructed path
    Walkway widthEnough for two people to pass
    Counter space beside appliancesLanding space on both sides

    Our pick: Plan the triangle before the cabinets. Moving a sink later is expensive.

    Decision 3: Cabinet construction and finish

    Cabinets differ in box construction, door style and finish. The choice affects the look, the strength and the price.

    OptionGood forTrade-off
    FramedTraditional look, strong face frameSmaller openings
    FramelessModern look, more storageNeeds accurate install
    Painted or veneer finishColour and wood lookDurability depends on finish

    Our pick: Frameless for modern kitchens, framed for traditional. Choose the finish for the wear the kitchen gets.

    Decision 4: Countertops and backsplash

    Countertops set the look and the wear. Backsplash protects the wall and ties the room together.

    MaterialStrengthMaintenance
    QuartzHigh, low porosityLow
    Granite or natural stoneHigh, needs sealingMedium
    LaminateLower, budget-friendlyLow, can chip

    Our pick: Quartz for most kitchens. Template the counter after the cabinets are level.

    Decision 5: Plumbing, electrical and ventilation

    The kitchen needs dedicated circuits, the right supply and drain for the sink and dishwasher, and a range hood vented outside.

    ServiceRequirement
    Small appliance circuitsTwo or more, separate from the rest
    Sink and dishwasherSupply, drain and venting planned
    Range hoodVented to the outside

    Our pick: Plan the services while the walls are open. Vent the hood to the outside, not into the attic.

    Decision 6: Lighting and layers

    Kitchen lighting works in layers: general, task and accent. The layers are planned with the cabinets and the switches.

    LayerUse
    GeneralOverall light for the room
    TaskUnder-cabinet light over the counter
    AccentPendants or toe-kick light

    Our pick: Plan the lighting with the cabinets. Under-cabinet light is the most used layer.

    Decision 7: Flooring and subfloor

    The floor is levelled and checked before the cabinets go in. The subfloor decides whether the cabinets stay level for years.

    ItemCheck
    SubfloorFlat, sound, fastened
    Floor finishDurable and water-resistant
    TransitionsSet at the room edges

    Our pick: Level the subfloor before the cabinets. A dip in the floor shows in every door.

    Decision 8: Permits and inspection

    A kitchen remodel is permitted when it moves plumbing, electrical or walls. Replacing cabinets in place usually needs no permit.

    ScopeCheck
    Cabinets and counters onlyUsually no permit
    Moved sink or appliancesPermit and inspection
    Wall removedEngineering and permit

    Our pick: Confirm the permit before the walls open. Moving services is inspected before it is covered.

    Decision 9: Warranty and maintenance

    Cabinets, counters and appliances carry warranties. Simple care keeps them working and protects the warranty.

    ItemWhat to do
    Cabinet hinges and drawersAdjusted when they move
    CountersCleaned and sealed where needed
    AppliancesServiced on the manufacturer schedule

    Our pick: Keep the install and product records. They are needed for the warranty.

    Prev
    Next
    x

    Get plugged in

    Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
    • Image
    • SKU
    • Rating
    • Price
    • Stock
    • Availability
    • Add to cart
    • Description
    • Content
    • Weight
    • Dimensions
    • Additional information
    Click outside to hide the comparison bar
    Compare

    Knowledge

    Keep reading.

    Guides that answer the questions before you book.

    Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →