Where does site preparation fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Site Preparation

Planned for the home you live in, with the work done in order and the site kept clean.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Site Preparation

Included in the full new-build plan, with the trades coordinated under one lead.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Site Preparation

Scheduled around occupancy, built to the commercial code and the building use.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For high-rise buildings: Site Preparation

Planned for vertical access, fire separation, sound and the building schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For renovations: Site Preparation

Scoped with the rest of the renovation so the trades work in the right order.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Site Preparation

Clearing, levelling and compacting the site so the foundation, the build or the landscape starts on solid ground.

How this guide works

Site preparation sets up everything that follows. The ground has to be cleared, levelled, drained and compacted to the standard, or the foundation and paving will move. Work through the decisions in order.

Decision 1: Where site preparation is used

Site preparation goes before new builds, additions, garden suites, driveways and commercial sites. The scale decides the equipment.

UseTypical scopeWhat matters most
New homesClear, grade, compact padLevel, drainage, soil
Additions and suitesSmall pad, accessAccess, clearance, drainage
Commercial sitesFull site gradingLoad, access, drainage, schedule

Our pick: The site is prepared to the foundation plan, not to the old grade.

Decision 2: Survey and grade

The site is surveyed for levels, drainage and the existing grade. The new grade is set to direct water away.

ItemCheck
Existing gradeMapped and recorded
New gradeFalls away from the building
DrainageOutlets and swales confirmed

Our pick: Set the grade before the work starts. Changing it later is costly.

Decision 3: Clearing and removal

Vegetation, old structures, debris and topsoil are removed. The topsoil is kept if it will be reused.

MaterialAction
Trees and stumpsRemoved or ground
Old structuresDemolished and removed
TopsoilStripped and stockpiled

Our pick: Keep the topsoil if you plan to landscape. It is valuable and expensive to replace.

Decision 4: Compaction

The soil is compacted in layers to the standard for the load. Poor compaction is the most common cause of settlement.

UseCompaction
Under foundationsCompacted to the engineer standard
Under drivewaysCompacted to the pavement design
Landscape areasCompacted lightly, to avoid settlement

Our pick: Compact to the load. Settlement under a foundation shows up as cracks.

Decision 5: Access and staging

Machines, trucks and materials need access. The site is staged so the trades can work in order.

ItemPlan
Machine accessClear route to the work
Material stagingPlanned storage area
NeighboursProtected from the work

Our pick: Plan access before the machines arrive. It decides how fast the work goes.

Decision 6: Warning signs and timing

Site preparation problems show as settlement, standing water and soft ground. These are signs the base is not ready for the build.

SignAct by
Soft or wet spots in the padTesting the soil and the drainage
Standing water after rainChecking the grade and the outlets
Settlement after the first seasonChecking the compaction

Our pick: Test the soil before the build. A soft pad is much cheaper to fix before the foundation than after.

Decision 7: Permits and inspection

Site preparation for a new build is part of the permit. Grade changes near the property line and the drainage outlets are checked.

ScopeCheck
New build padPart of the permit and grading check
Grade change at the property lineConfirm with the municipality
Drainage outletChecked before the outlet is connected

Our pick: Confirm the grading plan before the site is cut. Changes to the grade need approval.

Decision 8: Coordination with the other trades

Site preparation is the base for the foundation, the drainage and the landscape. Each depends on a level and compacted site.

TradeWhat it needs from site prep
Excavation and foundationPad level and compacted to the engineer standard
DrainageOutlets and falls set before the build
LandscapeTopsoil kept and graded
Access for tradesClear routes and a staging area

Our pick: Set the pad and the drainage before the foundation. Everything else sits on them.

Decision 9: Warranty and maintenance

A well-prepared site stays stable when the drainage is kept clear. The compaction and grading record protects the house.

ItemWhat to do
DrainageKept clear and checked after storms
GradeChecked after big landscape work
RecordsCompaction and grading kept

Our pick: Keep the grading and compaction record with the house file.

Questions

Why does compaction matter?

Loose soil settles under the foundation or the paving, and the settlement causes cracks.

Can you handle the soil?

Yes. Soil is removed or reused as the plan requires.

Do you do the drainage too?

Drainage is planned as part of the site preparation.

Talk to the Plug

Tell us the site, the build and the access. We survey the grade, clear the site and compact it to the standard.

Related: ExcavationConcrete & FoundationsAll contracting

Haven’t called the Plug yet?

Call, text, DM us, or submit your project and an expert will call you.

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →