Whole-Home Renovations

Restoration, inspection, construction and renovation under one plugged-in system.

Where does whole-home renovations fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

For homeowners: Whole-Home Renovations

Scoped room by room, with the rest of the home kept usable during the work.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For condo owners: Whole-Home Renovations

Planned around the building rules, the board approval and the access schedule.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For commercial spaces: Whole-Home Renovations

Scheduled around the business, with the trades working in order and the site kept safe.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For rental properties: Whole-Home Renovations

Planned for durability and a fast turnaround between tenants.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

For custom homes: Whole-Home Renovations

Built into the full new-build plan, with one lead from the first drawing to handover.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Whole-Home Renovations

Renovate the whole house in one planned project, room by room, with one team and one schedule.

What it is

A whole-home renovation updates every main area of the house in one project. It is planned as a single scope, so the trades, materials and inspections are coordinated instead of booked room by room.

It suits homes that need the layout, finishes and systems brought up together, and it avoids the cost of opening the same walls twice.

How it works

  1. Assess the houseWe walk every floor and check the structure, systems and envelope before any plan is set.
  2. Plan the scopeYou get a room-by-room scope, the decisions that matter and a timeline.
  3. Phase the buildThe work is staged so you can keep living in the home where possible.
  4. HandoverA final walkthrough, the documents and a plan for the systems.

What we look at

Layout

Walls, openings and flow changed where they make the home work better.

Systems

Electrical, plumbing and HVAC updated while the walls are open.

Finishes

Floors, paint, trim and fixtures planned as one finish package.

Decision 1: Where whole-home renovation is used

A whole-home renovation updates every main area of the house in one planned project. It suits homes that need the layout, finishes and systems brought up together.

HomeWhat it usually coversWhat matters most
Older houseLayout, systems, finishes, envelopeStructure and hidden moisture
Family home needing more spaceLayout changes, additions, finishesPhasing around the family
Investment propertyFinishes, systems, durabilityCost and turnaround

Our pick: Plan the whole house as one system. Systems, structure and finishes depend on each other.

Decision 2: Assessment and the starting point

The whole house is assessed before the scope is set. The structure, moisture, systems and envelope show what must be fixed first.

ElementWhat is checked
StructureLoad path, movement, damage
Moisture and envelopeWater entry and hidden moisture
SystemsElectrical, plumbing, HVAC capacity and condition

Our pick: Assess before the scope. The hidden conditions set the order of the work.

Decision 3: Layout and flow

The layout is designed around how the house is used. Walls, openings and circulation are decided before the finishes, because the finishes follow the layout.

Layout choiceEffect
Open the main floorMore light and flow, structural work
Move kitchen or bathroomPlumbing and venting changes
Add rooms or storageFraming and finishes

Our pick: Design the layout first. Finishes chosen before the layout are rarely right.

Decision 4: Systems upgrade

Electrical, plumbing and HVAC are upgraded while the walls are open. Capacity for the new layout is set once, not patched later.

SystemUpgrade
ElectricalPanel and circuits sized to the layout
PlumbingSupply and drain to the new fixtures
HVACSized and ducted to the new layout

Our pick: Upgrade the systems when the walls are open. It is far cheaper than opening them again.

Decision 5: Envelope and moisture control

The envelope is repaired and insulated as part of the renovation. Water entry is stopped before the finishes go on.

ElementAction
Windows and doorsReplaced where failing, flashed correctly
Insulation and air sealingImproved while walls are open
VentilationPlanned with the new air barrier

Our pick: Fix the envelope before the finishes. A finished house with a leaking envelope is a wasted renovation.

Decision 6: Phasing and living in the house

The renovation is phased so the house stays usable. The phases are planned with the trades and the household.

PhaseTypical work
Phase oneStructure, systems, envelope
Phase twoWalls, insulation, drywall
Phase threeFinishes, fixtures, final clean

Our pick: Phase the work so the house can be lived in. The plan is written before the first wall opens.

Decision 7: Permits and inspections

A whole-home renovation usually needs permits for structure, plumbing, electrical and HVAC. Each is inspected before it is covered.

WorkApproval
Structural changesEngineering and permit
Plumbing and electricalTrade permits and inspections
HVACPermit and inspection

Our pick: Plan the permits into the schedule from the start. Inspections set the pace of the work.

Decision 8: Finishes and the final result

Finishes are chosen as a package, so the floors, paint, trim and fixtures work together. The package is decided before the finish stage starts.

FinishDecided by
FloorsStyle, wear and the room use
Paint and trimLight and the look of the house
FixturesFunction and the finish package

Our pick: Decide the finish package before the finish stage. Mixed choices made late do not match.

Decision 9: Handover and house file

At handover the owner gets the walkthrough, the documents and a maintenance plan. The house file keeps the record of every system and finish.

DocumentUse
Permit and inspection recordsProof the work was approved
Product and warranty recordsCare and claims
Maintenance planKeeps the house working

Our pick: Hand over the full house file. It is what the next owner and the next trade need.

Questions

Can we live in the house during the work?

Often yes, with planning. We will talk through the phasing and what daily life looks like.

Why do a whole-home project instead of room by room?

Work done together avoids opening the same walls twice and keeps the finishes consistent.

How long does it take?

It depends on the scope. We give a timeline once the plan is agreed.

Related: Kitchen RemodelsBathroom RenovationsAll renovations

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →