ClearScope Takeoffs for Builders | The Builders Plug

Restoration, inspection, construction and renovation under one plugged-in system.
ClearScope™ takeoffs · Residential and commercial · Toronto to North America

Send the drawings. Get back every line.

Every item named, measured and tagged for the bid. Then the part nobody else gives you: material costs with a low–high range, and a branded proposal to sell the job. Quantities, cost and the proposal, from one set of drawings, checked by a builder before it reaches you.

20+ years buildingWSIB covered$5M insuredRemote, North America-wide
Which type of builder are you?

Select and check your results.

Tick every line that sounds like how you work today. Your result updates below.

0of 6 ticked

Tick the lines that sound like you to see where you stand.

Part 2 · Pick a side on each row

Which side is you?

Pick the side that describes you on each row. Your result updates below.

The builder who guesses
The builder who knows
0guesses
0knows

Pick a side on each row to see where you stand.

The builder who knows checks every trade price against the real quantities, knows the margin before the contract is signed, and bids with confidence. The difference isn’t talent or hustle. It’s knowing the true quantities.

Every line, one document

Every line, one document

Most bids are built from three different quotes, a supplier’s guess and a spreadsheet nobody checked. ClearScope replaces that with one document.

You send the drawing set. We read every sheet, name every item with its spec, measure every quantity, set waste line by line and tag each line Verified, Allowance or Excluded. You get it back split by trade, ready to price, send to subs or put in front of a client.

No renders, no design work, no site visit. Blueprints in, takeoff out.

A floor plan, a specification book and a colour-coded quantity takeoff sheet laid out together
The cost of guessing

One missed line costs more than the takeoff.

When the numbers are a guess, you pay one of two ways. Price high to cover it and lose the bid. Price low to win it and lose the margin on site.

Example

Off by 3% on a $150,000 job

If you guess:

  • 3% missed on quantities: $4,500 out of your margin
  • A 5% area miss on the same job: $7,500 gone
  • Waste left out of the total, so the order comes up short
  • Extra material bought to cover the gap, paid for twice

ClearScope:

  • $1,800 for a four-division envelope takeoff
  • Every waste factor set per item, every area measured to scale
Example

Short 20 sheets of drywall mid-job

If you guess:

  • The missing sheets, bought again at the top-up price
  • Hanging waits on the sheets, so the crew stands idle
  • Boarding, taping, plastering and painting all pushed back
  • A second delivery and a lost day on site

ClearScope:

  • $250 for the drywall division
  • The count known up front, delivery planned once
Example

A sub pads their number

If you guess: you can’t check it, so you pay for

  • Every padded quantity on their number
  • Their markup on materials they never needed
  • Their labour on hours that were never counted

ClearScope:

  • $250 per division to know the real quantity
  • Your count, so the sub prices your numbers

Guessing costs you either way. Knowing costs $250.

What you save

Hours back. Money kept. Mistakes caught.

1

Hours

No more nights counting studs off a PDF. Send the set in the morning and spend the day selling, running jobs or bidding the next one.

2

Money

No full-time estimator to carry. No margin lost to a missed line. No over-ordering because the waste was a guess.

3

Mistakes

Every line measured, waste set per item, every Allowance and Exclusion written down. The items that get missed on site get caught on paper.

4

Bids

When the counting is done for you, you can say yes to more invitations to bid, without adding staff.

Calculator

What is guessing costing you?

Plug in your numbers. See your hours, your money and your margin at risk. Nothing is sent anywhere.

Hours back a year0
Value of that time$0
Margin at risk a year$0
Bid Partner a year$12,000

Your figures, your math. Bid Partner is $1,000 a month for 4 takeoffs. Single takeoffs are $250 per division. Prices in CAD before tax. Planning figures, not a guarantee.

Who ClearScope is built for

GC
Builders and general contractors

Every division of a job, so you check every sub and price with confidence.

TR
Subcontractors and trades

Done-for-you quantities for your trade, every bid you send.

SD
Suppliers and distributors

Fast, accurate material counts so you can quote contractors the same day.

DA
Developers, architects and engineers

A full takeoff and cost estimate to plan and budget a build.

Four ways to get your numbers. One makes sense.

GuessingFull-time estimatorClearScope
CostHidden in lost marginSalary and benefits, paid whether busy or not$250 per division, or $1,000 a month
ContractNoneEmploymentPer project, no contract to start
To get startedNothingHire and trainSend one set
Checked by a builderNoYesYes, every set
Material cost rangeNoExtra workAdd-on
Proposal for your clientNoExtra workAdd-on
Trades to build itNoNoThe Builders Plug network

Big-firm numbers. Small-firm price. No contract to start.

Everything in a ClearScope

Six things, done the same way every time

1

Read the set

  • Every sheet read: plans, elevations, sections, structural, schedules
  • Notes, details and specs pulled into the line items
  • Conflicts between sheets flagged, not guessed
2

Name every item

  • Each line carries its spec: size, grade, gauge, rating
  • Items named the way suppliers and trades price them
  • No “misc.” lines
3

Measure every quantity

  • Taken off the drawings to scale
  • Converted to buyable units: sheets, sticks, bags, rolls, yards
  • Imperial and metric shown where the trade needs both
4

Set waste line by line

  • Each item type gets its own factor
  • Factor shown on the line, not buried in a total
  • Adjusted for cuts, layout and openings
5

Tag every line for the bid

  • Verified: measured from the drawings
  • Allowance: a placeholder where the set is silent
  • Excluded: named and left out, so nobody assumes it
6

Split by trade, and deliver

  • One section per division, ready to send to each sub
  • Delivered as a PDF and a spreadsheet
  • Checked by a builder before it goes out
Every line tells you how sure it is

Verified. Allowance. Excluded.

Three tags, three meanings, on every line of every ClearScope. Nothing is left for you to guess.

Verified

Measured directly from the drawings. Price it with confidence.

✓

Allowance

The set doesn’t show it, so we carry a named placeholder quantity. You know exactly where the open risk sits.

%

Excluded

Named and left out on purpose, such as permits, or anything by others. Nobody assumes it was included.

×

An unwritten exclusion becomes your cost on site. We write them all down.

A takeoff, step by step

From your drawings to a takeoff you can bid from

1

Send the set

Drawings, and what needs taking off.

2

Price confirmed

By email, before any work starts.

3

Takeoff prepared

Read, measured, tagged and split by trade.

4

Builder check

Quantities checked against the drawings.

5

Delivered

PDF and spreadsheet, ready to bid.

6

Questions answered

We walk you through any line.

Turnaround depends on the size of the set and is confirmed in writing before work begins.

Divisions we take off

Twenty divisions. Every one covered.

Every division we take off, numbered the way the drawings are. Residential sets usually run 01 to 18. Commercial sets can include all twenty.

01Site work and demolition
02Excavation and earthwork
03Concrete
04Masonry
05Structural steel and metals
06Framing and rough carpentry
07Building envelope
08Roofing
09Doors and hardware
10Windows and glazing
11Drywall and ceilings
12Flooring and tile
13Painting and finishes
14Custom millwork
15Architectural millwork and specialties
16Plumbing
17HVAC
18Electrical
19Fire protection
20Conveying
What a ClearScope looks like

Two sample sheets, side by side

Illustrative samples. Real lines from a past job, with client details removed, replace these once one is picked.

Residential sample: addition

DivItemQtyWasteTag
03Strip footings, 24 in × 8 in, 25 MPa6.2 m³5%Verified
06Exterior wall studs, 2×6 SPF, 16 in o.c.412 pcs10%Verified
07Wall sheathing, OSB 7/16 in96 sheets8%Verified
07House wrap, 9 ft × 150 ft4 rolls10%Allowance
02Excavation and haul-away——Excluded

Commercial sample: drywall, one floor of an office fit-out

DivItemQtyWasteTag
11Steel stud, 3-5/8 in, 25 ga, 16 in o.c.1,840 pcs5%Verified
11Type X board, 5/8 in, 4 × 10210 sheets10%Verified
11Acoustic insulation, 3-1/2 in3,600 sq ft5%Verified
11Bulkheads at corridor, per reflected ceiling plan120 lin ft10%Allowance
19Firestopping at penetrations——Excluded
A real ClearScope

Basement second unit: 21 drawing sheets, one takeoff you can order from

A real ClearScope from a completed job: a basement turned into a legal second unit. Client details are removed, prices are withheld, and part of the list is held back. Download the sample to see every line.

112

lines taken off

13

divisions

26

named allowances

4

written exclusions

Client details removed · Prices withheld · WSIB covered · $5M liability · OBC-informed

Free guide

One Bad Estimate.

Why 6 in 10 construction businesses are gone within ten years, and how to price like the big firms without hiring an estimator. Written by the person who runs the jobs.

  • The numbers: how many builders start, and how many are still standing
  • How a small quantity miss turns into a lost job
  • The two kinds of builders, and the five habits big firms use
  • A real basement second unit, taken off line by line
Your estimating department

You don’t need a full-time estimator.

Large builders win because someone on staff knows the numbers. Most builders can’t carry that payroll, so they guess. ClearScope gives you the same numbers, paid per project.

Full-time estimator on staffClearScope
How you payA salary and benefits, whether the bids are busy or notPer project: $250 per division, or $1,000 a month for Bid Partner
CapacityOne person’s hoursAs many sets as you bid
QuantitiesMeasured by one personMeasured, waste set per item, tagged Verified, Allowance or Excluded
Material cost rangeExtra workAdd-on, with low-high range per division
Client proposalExtra workAdd-on, branded under your company name

No estimator on staff?

We’re your estimating department, paid per project. No payroll to carry through the slow months.

Already have one?

Send us the counting. Your estimator gets every quantity back and spends their time pricing the job for your company, not measuring studs.

Your estimating partner, without the payroll.

Pricing

Priced per project, by division

Never per sheet. Anything beyond a bundle is quoted as a full project.

Single-trade takeoff

One division, e.g. framing or drywall

$250

per division · four divisions $1,000

Envelope takeoff

Foundation to roof

$450

per division · four divisions $1,800

Bid Partner

4 takeoffs a month, priority turnaround

$1,000

per month

Prices in CAD, before tax. Based on a typical home of about 1,900 to 2,000 sq ft. Larger homes are quoted per project.

Commercial

Single-trade bid

One trade on one project.

Quoted per project

Full-building trade bid

One trade across every floor and unit.

Quoted per project

Full takeoff and cost estimate

Every division, with estimated cost of build.

Quoted per project

Prices in CAD, before tax. Takeoffs and cost estimates are planning figures, not contract prices.

What changes the price

01

Residential or commercial

Commercial sets carry more sheets, units and divisions.

02

Project type

Renovation, addition, new build, single-trade, full-building or full estimate.

03

Floor area

Total square footage across all levels.

04

Storeys and units

Each floor and unit type adds measuring.

05

Divisions in scope

One trade or every trade.

06

Drawing quality

A complete, to-scale set takes less time than a partial one.

07

Bundle or full project

Bundles of divisions, or the whole building.

08

Takeoff or cost estimate

Quantities only, or quantities plus estimated cost.

09

Deadline

Rush turnaround is quoted separately.

Add-ons other takeoff services don’t offer

Most takeoffs stop at quantities. ClearScope goes two steps further.

1. Material cost range

What the job will cost, before anyone bids it.

  • Every line priced for materials, with a low-high range
  • Totals per division and for the whole job
  • Built from current supplier pricing and checked against industry cost data
  • Labelled as planning figures, not a quote
  • Priced per project

2. ClearScope proposal for your client

The document to sell the job with.

  • Your takeoff turned into a branded scope-of-work proposal, under your company name and logo
  • Every line your client is paying for, with inclusions, allowances and exclusions written out
  • Ready to send to the homeowner, GC or owner you’re pricing for
  • Option: your proposal template set up so you can reuse it on every job
  • Priced per project

Quantities, cost and the proposal, from one set of drawings. Send the set →

Objections

You’ve got reasons. We’ve heard them all.

“I already do my own takeoffs.”

Then you know how many nights they eat. Send us the counting and spend those hours selling and running jobs. Check our first set against yours.

You get your evenings back and a second set of eyes on every bid.

“My trades give me their prices.”

Then your trades are setting your price. With the real quantities you can check every number they send and see when one is padded.

You price the job. Not your subs.

“I price by the square foot. It works.”

Until the house has a vaulted ceiling, a steel beam and three bathrooms. Square-foot pricing averages out the exact details that make or lose money.

Price the house you’re building, not the average one.

“I already have takeoff software.”

Software measures what you click. It doesn’t read the notes, catch conflicts between sheets, set waste per item or write down what’s excluded. A builder does.

The quantities, plus the judgement software doesn’t have.

“I already have an estimator.”

Good. Give them their time back. We do the counting, and they price the job for your company and chase more bids.

Same estimator, more bids out the door.

“It’s too expensive.”

It’s $250 a division. One missed item on site costs more than that. Bidding four jobs a month? Bid Partner covers all four for $1,000.

The cheapest line in your bid is the one that protects the rest.

“What if I don’t win the bid?”

Then you’re out $250, not the margin on a job you won by underpricing. Sharp numbers let you bid tight without giving the job away.

Lose a bid, not your shirt.

“How do I know it’s accurate?”

Every line shows its source: Verified from the drawings, Allowance where the set is silent, Excluded in writing. A builder checks every takeoff before it’s sent, and we walk you through any line you question.

Nothing hidden, nothing assumed.

“My drawings aren’t complete.”

Send what you have. Anything the set doesn’t show becomes a named Allowance, so you see the risk before you sign, not on site.

Even a partial set gets you a usable number.

“I’ve got a bid deadline.”

Your turnaround is confirmed in writing with your price, before we start. If we can’t make your date, you hear it up front.

You know when it lands before you commit.

“You don’t know my market.”

Quantities don’t change by city: a 2×6 is a 2×6 in Toronto or Texas. You price it for your market, and the cost range add-on uses current supplier pricing.

The count is universal. The pricing stays yours.

“Commercial is a different game.”

It is, and so is the takeoff: single-trade bids, every floor and unit of a building, and full estimates for developers and architects.

One partner from a basement to a plaza.

“I’ve never heard of you.”

20+ years building, WSIB covered, $5M insured, and a builder on every set. Send one set and judge the work, not the website.

The first takeoff is the proof.

Start with one set

Send one set. Judge the work.

Pick the divisions, get your price by email, and only go ahead if it works for you. If the first set earns its keep, keep sending.

  • Price confirmed before any work starts
  • Pay per project
  • Upgrade to Bid Partner when you’re bidding every week

Your first set

Pick the divisions. Get the price. Then decide.

Your price and turnaround come back by email before any work starts.

Four steps. Written at every one.

Send. Confirm. Deliver. Build.

1

Send

Upload the set and pick the divisions.

2

Confirm

Price and turnaround by email, before work starts.

3

Deliver

Your ClearScope as a PDF and a spreadsheet, split by trade.

4

Build

Need the crew too? Add vetted trades from The Builders Plug network.

Send your set

Tell us about your project.

Upload the drawings and tell us what needs taking off. Your price and turnaround come back by email before any work starts.

Is your set ready?

Is your set ready for a takeoff?

Tick what you have, then answer three quick questions.

Do you know which divisions are in the bid?
Is the set the current revision?
Do you need a cost estimate as well as quantities?
Six questions

Six questions to ask any takeoff provider

1

Does the list name every item with its spec?

A quantity with no spec can’t be priced or ordered.

2

Is waste set per item, or one number on the total?

One blanket factor over-orders some items and short-orders others.

3

Which lines are measured and which are guesses?

Allowances should be named, so you know where the risk is.

4

What’s excluded, in writing?

An exclusion nobody wrote down becomes your cost on site.

5

Who checks the quantities against the drawings?

Software misses what a builder catches.

6

What exactly do I receive?

You should get a file you can send to subs, not just a total.

Every ClearScope answers all six, in writing. Send the set →

Why ClearScope

Built by builders, not a software company

  • 20+ years on site, not a software company
  • Every line named, measured and tagged
  • Waste set per item, never one blanket number
  • Exclusions written down, never assumed
  • Split by trade, ready to send to subs
  • Residential and commercial, from one kitchen to a full building

Our standard

  • A written price and turnaround before work starts
  • A builder checks every takeoff before it’s delivered
  • Every Allowance and Exclusion named in writing
A dark blueprint table with material samples and a laptop showing a project plan

Illustration.

Built in Toronto

Built in Toronto, working across North America

We started on GTA jobs and still build here. Takeoffs are done from your drawings, so where the job is doesn’t matter.

1

Toronto and the GTA

Mississauga, Brampton, Vaughan, Markham, Richmond Hill, Oakville, Burlington, Hamilton

2

Canada

Ontario, then Ottawa, Montreal, Calgary, Edmonton, Vancouver

3

North America

US builders and trades, with imperial quantities as standard. Scopes are OBC-informed for Ontario jobs; elsewhere we follow your drawings and local notes.

FAQ

Frequently asked questions

What do I send?

The drawing set as PDFs: plans, elevations, sections, structural and schedules, plus which divisions you need.

What do I get back?

One ClearScope document as a PDF and a spreadsheet: every item with its spec, quantity, waste and tag, split by trade.

How much does a takeoff cost?

Residential single-trade takeoffs are $250 per division and envelope takeoffs $450 per division. Commercial work is quoted per project. You get the price in writing before work starts.

How long does it take?

It depends on the size of the set. Your turnaround is confirmed by email with your price.

Do you do commercial work?

Yes: single-trade bids, full-building trade bids, and full takeoffs with a cost estimate.

Is a takeoff or estimate a fixed price for the build?

No. Takeoffs and cost estimates are planning figures, not contract prices.

Do you price by sheet?

No. Pricing is per project, by division. Anything beyond a bundle is quoted as a full project.

Do you work outside Toronto?

Yes. Takeoffs are done from your drawings, anywhere in Canada and the US.

Can you also supply the trades?

Yes. Vetted trades from The Builders Plug network can be added to any job.

Next bid

Your next bid starts with the drawings.

Send the set today. Get your price before any work starts.

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →