Demolition

Restoration, inspection, construction and renovation under one plugged-in system.

Where does demolition fit your project?

Pick the closest match. Each one shows how we handle that kind of job, then you can go deeper or book a visit.

Interior demolition: Demolition

Strip finishes, walls and fixtures inside the house before a renovation.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Exterior demolition: Demolition

Remove decks, porches, sheds, garages and cladding before an addition or new build.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Full demolition: Demolition

Take the building down to the foundation for a teardown and rebuild.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Fire and large loss: Demolition

Remove burned or water-damaged material safely, then prepare for the rebuild.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Selective demolition: Demolition

Remove only the marked parts and keep the rest of the house standing.

  • Scope agreed in writing before any work starts
  • One lead on site from start to handover
  • Clear records at handover

Knowledge

Haven't called the Plug yet?
Need to learn more?

Read what the team knows, then get plugged in. Call, text, DM or submit, whichever way suits you.

Learn more before you plug in

See all knowledge →

Demolition is the first real step of most projects, and the one that decides what the rebuild can do. We plan it decision by decision: what comes out, what stays, what is hidden behind the finishes, and what the site needs before the crew starts.

How demolition is planned, decision by decision

Decision 1: Which demolition is right for your project

Demolition is not one job. The method depends on whether the structure stays, which finishes come out and what is hidden behind them.

TypeScopeTypical use
InteriorFinishes, walls and fixtures inside the houseGut renovation, basement finishing
ExteriorDecks, porches, sheds, garages and claddingBefore an addition or new build
FullThe building taken to the foundationTeardown and rebuild
Fire and large lossBurned or water-damaged material removed safelyAfter a loss, before the rebuild
SelectiveOnly the marked parts removedOpening a wall, changing a layout

Our pick: Start with the plan of what stays. Everything else is the demolition scope.

Decision 2: Testing before anything is opened

Houses built before the 1990s can contain asbestos, lead and other hazards. Ontario rules require an asbestos survey before most demolition work, so we test before the first wall comes down.

HazardWhere it hidesAction
AsbestosOld flooring, pipe wrap, popcorn ceilings, drywall compoundSampled and lab tested; licensed removal if found
LeadOld paint on trim, doors and windowsTested, with containment set before work
MouldBehind finishes after leaksSampled and treated under our mould process

Our pick: Test first. A wall opened before testing cannot be closed back up the same way.

Decision 3: Permits and utilities

A building permit is needed for structural changes, and some demolition needs a permit from your municipality. Power, gas and water are shut off or isolated before any cutting starts.

ItemWho handles itWhen
Building permitOur team, with youBefore structural work
Utility shut-offsThe utility and our crewBefore any cutting
Shared-wall coordinationOur teamBefore work touches a shared wall

Our pick: Confirm the permit and the shut-offs before the first cut.

Decision 4: The structural check

Load-bearing walls, beams and posts carry the house. Before anything comes out, we identify what holds the structure up, and temporary support is in place wherever the load will move.

ElementCheckAction
Load-bearing wallsPosition and directionEngineer review where needed
Beams and postsSize and bearing pointsTemporary shoring before removal
FoundationCracks and movementRecorded before work begins

Our pick: Support first, remove second. The load moves before the wall does.

Decision 5: Containment and dust control

Demolition makes dust, debris and noise. The work area is sealed and the rest of the house is kept clean, so the parts you live in stay usable where possible.

MeasurePurpose
Plastic barriersSeal the work area
Negative airPulls dust out through filtration
Protected floors and stairsKeep the rest of the house clean

Our pick: Seal the work area before the first cut. Dust travels further than you expect.

Decision 6: Sorting, salvage and removal

Debris is sorted as it comes out. Clean wood, metal and fixtures go to recycling, and doors and fixtures are salvaged where they can be reused. Waste is hauled off site in bins sized to the job.

MaterialRoute
Wood and metalSorted for recycling
Doors and fixturesSalvaged where reusable
Drywall, insulation and finishesHauled to disposal

Our pick: Sort as you go. It lowers the disposal cost and keeps the site clear.

Decision 7: Protecting what stays

Demolition removes only what is marked. Adjacent rooms, finishes and systems that stay are protected from damage during the work.

ItemProtection
Adjacent roomsBarriers and covered floors
Wiring and plumbing that stayMarked and kept live where needed
Exterior surfaces near the workCovered during the work

Our pick: Mark what stays before the first tool comes out.

Decision 8: Handover to the rebuild

The site is cleaned to a rebuild-ready state. Framing is checked, exposed systems are inspected, and the rebuild trades start from a clear point.

CheckResult
FramingChecked square and sound
SystemsInspected before the walls close
SiteCleaned and ready for the next trade

Our pick: Hand over a ready site. The rebuild starts on time when the site is clean.

Decision 9: What drives the scope and the timing

The size of the job, the access to the site, the materials and any hazards decide the scope and the schedule. Each is confirmed in writing before work starts.

FactorEffect
Size and accessCrew, bins and time on site
Materials and hazardsTesting and removal method
Structural changesPermits and engineering

Our pick: Confirm the scope in writing before the crew arrives. No surprises on site.

Questions we get asked

Do you handle the asbestos testing and removal?

We test first and coordinate the work. Asbestos found in the scope is removed by a licensed contractor, and the clearance is recorded in the project file.

Do I need to move out during demolition?

For interior and selective work the living space is often kept usable behind barriers. For full demolition or a structural change, the house is usually vacated for the work.

Is the debris removal included?

Debris removal is part of the scope we confirm in writing. Sorting and salvage are used where they lower the cost.

Book a site visit

A site visit confirms the type of demolition, the testing needed and the permits. You get a written scope before any work starts.

Related services

Prev
Next
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Knowledge

Keep reading.

Guides that answer the questions before you book.

Meet the team behind every job: one lead, one scope owner, one records keeper.Meet the team →